Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Oct 31, 2022     Air filter holder; Baffles - (1.9 hours)       Category: Firewall Forward
1. Coutersunk the underside of the attach holes for the stiffener angle on the left inlet baffle floor.
2. Masked and primed the interface between the angle and the baffle.
3. Bent and fitted the air filter holder aft Z-channel to the baffle floor.
4. Marked the baffle floor for the location of the three screws that will hold the aft z-channel to the floor.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.